100 kW+ Turnkey Solar Plant
Turnkey engineering for 100 kW to 10 MW rooftop and ground-mount plants, in CAPEX, OPEX/RESCO or third-party ownership models.
100 kW+ Turnkey Solar Plant
Turnkey engineering for 100 kW to 10 MW rooftop and ground-mount plants, in CAPEX, OPEX/RESCO or third-party ownership models.
Every package is engineered for your roof or borewell, installed by our own electricians and backed by documented commissioning. Prices shown are indicative turnkey figures for Maharashtra excluding DISCOM charges such as net-meter fees which are billed at actuals.
Why buyers choose this package
- Complete bill of material shared before payment
- Subsidy and net-metering handled end to end
- Written generation estimate for your location
- Five-year O&M included, AMC at ₹5,999/year after that
Package highlights
186+ × 540 Wp modules, ground-mount or rooftop
Multi-inverter architecture with SCADA integration
PVsyst yield simulation and generation guarantee option
Structural, electrical and safety engineering package
Assistance with CAPEX, RESCO and bankable project reports
Technical specifications
| Capacity | 100 kW to 10 MW |
|---|---|
| Generation | ~12,000 units per month per 100 kW |
| Typical tariff offset | ₹7–₹11 per unit |
| Payback | 3–5 years depending on tariff |
| Models | CAPEX, RESCO, third-party owned |
| Warranty | 25 years module / 5–10 years inverter, with performance guarantee option |
What the price includes
- Feasibility study and financial model
- Detailed engineering and EPC
- Grid integration and approvals
- O&M with generation guarantee (optional)
Subsidy & payment process
Apply on portal
We file your PM Surya Ghar application with your electricity consumer number and Aadhaar details.
Feasibility approval
MSEDCL approves the sanctioned capacity for your connection.
Install & net-meter
Installation, inspection and bidirectional meter commissioning.
Subsidy in bank
Subsidy is credited to your linked bank account, usually within 30–45 days of commissioning.
100 kW+ Turnkey Solar Plant FAQs
How much subsidy do I get on rooftop solar in Maharashtra?
How many units does a 3 kW solar system generate per month?
How long does installation take after I confirm?
Do you help with the PM Surya Ghar subsidy application?
What is the difference between on-grid and hybrid solar?
Ready for 100 kW+ Turnkey Solar Plant?
Share your electricity bill and roof details. We will send a kW-by-kW proposal with subsidy, net cost, EMI and 25-year savings. No obligation, no hidden charges.