50 kW Industrial Solar Plant
For factories, warehouses and cold storages with daytime load. Reduces energy cost from the first month of generation.
50 kW Industrial Solar Plant
For factories, warehouses and cold storages with daytime load. Reduces energy cost from the first month of generation.
Every package is engineered for your roof or borewell, installed by our own electricians and backed by documented commissioning. Prices shown are indicative turnkey figures for Maharashtra excluding DISCOM charges such as net-meter fees which are billed at actuals.
Why buyers choose this package
- Complete bill of material shared before payment
- Subsidy and net-metering handled end to end
- Written generation estimate for your location
- Five-year O&M included, AMC at ₹5,999/year after that
Package highlights
93 × 540 Wp modules on shed or RCC
50 kW inverter with SCADA-ready monitoring
Walkway, cable tray and module cleaning access engineering
Safety systems: ACDB/DCDB, earthing, lightning protection
Accelerated depreciation and net-metering documentation
Technical specifications
| Modules | 93 × 540 Wp |
|---|---|
| Inverter | 50 kW three-phase |
| Generation | ~6,000 units per month |
| Roof area | ~500 m² |
| Payback | 3.5–4.5 years |
| Warranty | 25 years module performance, 5 years inverter, 5 years workmanship |
What the price includes
- Feasibility, structural audit and design
- Complete EPC
- Commissioning and handover documentation
- 1 year O&M with performance reporting
Subsidy & payment process
Apply on portal
We file your PM Surya Ghar application with your electricity consumer number and Aadhaar details.
Feasibility approval
MSEDCL approves the sanctioned capacity for your connection.
Install & net-meter
Installation, inspection and bidirectional meter commissioning.
Subsidy in bank
Subsidy is credited to your linked bank account, usually within 30–45 days of commissioning.
50 kW Industrial Solar Plant FAQs
How much subsidy do I get on rooftop solar in Maharashtra?
How many units does a 3 kW solar system generate per month?
How long does installation take after I confirm?
Do you help with the PM Surya Ghar subsidy application?
What is the difference between on-grid and hybrid solar?
Ready for 50 kW Industrial Solar Plant?
Share your electricity bill and roof details. We will send a kW-by-kW proposal with subsidy, net cost, EMI and 25-year savings. No obligation, no hidden charges.