Contact EcoHarbor Solar
Book a free site survey, request a quotation or ask a technical question. Our consultants respond within one working day — in Marathi, Hindi or English.
+91 98220 12345Mon – Sat, 9:30 AM – 7:00 PMsales@ecoharbor.in
Head office
EcoHarbor Solar Private Limited
3rd Floor, Solar House, Baner Road, Baner
Pune, Maharashtra 411045
GSTIN: 27ABCDE1234F1Z5
Contact & appointment FAQs
How much subsidy do I get on rooftop solar in Maharashtra?
Under PM Surya Ghar: Muft Bijli Yojana, residential consumers get ₹30,000 per kW up to 2 kW and ₹78,000 in total for 3 kW and above. The amount is credited directly to your bank account after installation and net-metering are completed.
How many units does a 3 kW solar system generate per month?
In Maharashtra a well-designed 3 kW rooftop system generates roughly 340–380 units per month across the year, higher in March–April and lower during the monsoon. That typically offsets most or all of a 2–3 BHK household’s consumption.
How long does installation take after I confirm?
Structural work and installation usually take 7–14 days for residential systems once material reaches your site. Net-metering approval and meter installation by MSEDCL typically add 3–6 weeks depending on the circle office workload.
Do you help with the PM Surya Ghar subsidy application?
Yes. We register your application on the national portal with your consumer number, follow up the feasibility approval with your DISCOM, submit the commissioning certificate and track the subsidy until it is credited to your bank account.
What is the difference between on-grid and hybrid solar?
An on-grid system exports surplus power and shuts down during a grid outage for safety. A hybrid system adds a battery bank so you keep running essential loads during outages while still enjoying net-metering credit for exported units.
Can I get a solar loan or EMI?
Yes. We prepare the project report and documentation for solar loans from SBI, Bank of Baroda, HDFC and NBFCs. A 3 kW system works out to roughly ₹2,450 per month over 60 months, which is usually less than the bill it replaces.
How much roof area is needed per kW?
Around 10 m² of shadow-free area per kW for standard modules, plus maintenance clearance. Elevated structures need slightly more spacing so module rows do not shade each other in December.
Do you service systems installed by other companies?
Yes. We audit the existing installation, list defects with photographs and quotes, then take over maintenance under an AMC or perform repairs such as inverter replacement, structure reinforcement or earthing rectification.
Talk to a solar engineer
Find out exactly how much you save — free of cost
Share your electricity bill and roof details. We will send a kW-by-kW proposal with subsidy, net cost, EMI and 25-year savings. No obligation, no hidden charges.