How to Compare Solar Quotations Without Getting Fooled

Six line items that separate a system that lasts 25 years from one that underperforms — check these before you sign anything.

15 Sep 20263 min readEcoHarbor Engineering DeskSavings & Payback
Solar illustration for article: How to Compare Solar Quotations Without Getting Fooled

Two quotations for "3 kW rooftop solar, all inclusive" can differ by ₹70,000 and still look identical on a single line. Here is what to compare, line by line.

1. Module make, wattage and certification

Ask for the module brand, wattage, cell technology and whether it is on the ALMM list. Subsidy claims require ALMM-listed modules. Check the module datasheet for the performance warranty and the degradation curve — 25-year warranties typically guarantee about 80–84% output at year 25.

2. Inverter model and warranty

The inverter is the most likely component to fail first. Ask for the model number, the warranty period (5 years minimum, extendable) and the monitoring capability. A generic inverter with no local service presence will cost you weeks of downtime.

3. Structure design and material

Ask for the structure drawing: material, section size, elevation height, galvanising type and corrosion warranty. Undersized structures cause module cracks in the first monsoon; non-galvanised sections rust within two years in coastal Maharashtra.

4. Cable sizing and protection

DC cable should be UV-resistant solar cable of the correct gauge for the string length; AC cable should be sized for the inverter output. Check for DC and AC distribution boxes, surge protection devices, a proper earthing pit and a lightning arrestor. This is the first thing trimmed in cheap quotations and the most common cause of failures.

5. Who handles subsidy and net-metering

Ask in writing whether the vendor files the PM Surya Ghar application, follows up the feasibility approval, and coordinates the net-meter installation — and whether that service is included or billed separately.

6. Service terms after installation

How many cleaning visits are included in year one? What is the response time for a fault? Do they give a written generation estimate, and what happens if generation falls short? A vendor who cannot answer the last question has not designed your system.

Red flags

  • Quotations without brand and model numbers.
  • Prices far below market — usually achieved by removing protection, structure or cable quality.
  • Advance payment demanded before a site survey.
  • Pressure to install before feasibility approval "to save time" — this can void your subsidy.

Our quotations always include a full bill of material with brand names, ratings and warranty terms, so comparison is straightforward and unglamorous.

EcoHarbor Engineering Desk
Solar engineer at EcoHarbor Solar
Share on WhatsApp

Need a quotation?

Our engineers will size a system for your exact roof and send a written proposal with subsidy and payback.

Book free survey

Estimate your savings

Use our calculator to see recommended kW, subsidy, net cost and 25-year savings in 10 seconds.

Open calculator

Frequently asked questions

How much subsidy do I get on rooftop solar in Maharashtra?
Under PM Surya Ghar: Muft Bijli Yojana, residential consumers get ₹30,000 per kW up to 2 kW and ₹78,000 in total for 3 kW and above. The amount is credited directly to your bank account after installation and net-metering are completed.
How many units does a 3 kW solar system generate per month?
In Maharashtra a well-designed 3 kW rooftop system generates roughly 340–380 units per month across the year, higher in March–April and lower during the monsoon. That typically offsets most or all of a 2–3 BHK household’s consumption.
How long does installation take after I confirm?
Structural work and installation usually take 7–14 days for residential systems once material reaches your site. Net-metering approval and meter installation by MSEDCL typically add 3–6 weeks depending on the circle office workload.
Do you help with the PM Surya Ghar subsidy application?
Yes. We register your application on the national portal with your consumer number, follow up the feasibility approval with your DISCOM, submit the commissioning certificate and track the subsidy until it is credited to your bank account.
Talk to a solar engineer

Find out exactly how much you save — free of cost

Share your electricity bill and roof details. We will send a kW-by-kW proposal with subsidy, net cost, EMI and 25-year savings. No obligation, no hidden charges.

Call Now Free Site Survey