+91 98220 12345 sales@ecoharbor.in Mon – Sat, 9:30 AM – 7:00 PM
MNRE Channel Partner • MSEDCL Empanelled Serving all of Maharashtra

Solar Panel Cleaning Robot / Manual AMC

Scheduled module cleaning and inspection that typically recovers 8–15% of generation lost to dust in Maharashtra.

Service agreement, renewable annually
Solar Panel Cleaning Robot / Manual AMC supplied and installed by EcoHarbor Solar in Maharashtra

Solar Panel Cleaning Robot / Manual AMC

Scheduled module cleaning and inspection that typically recovers 8–15% of generation lost to dust in Maharashtra.

Every package is engineered for your roof or borewell, installed by our own electricians and backed by documented commissioning. Prices shown are indicative turnkey figures for Maharashtra excluding DISCOM charges such as net-meter fees which are billed at actuals.

Why buyers choose this package

  • Complete bill of material shared before payment
  • Subsidy and net-metering handled end to end
  • Written generation estimate for your location
  • Five-year O&M included, AMC at ₹5,999/year after that

Package highlights

✔

12, 6 or 4 visits a year based on your dust levels

✔

Deionised water and soft-brush cleaning

✔

Thermal scan of modules once a year

✔

String current and earthing check

✔

Inverter log review

✔

Written performance report after every visit

Technical specifications

Coverageresidential and commercial systems
Visits12 / 6 / 4 per year
Includedcleaning, inspection, report
Optionalthermal scan, IV curve testing
WarrantyService agreement, renewable annually

What the price includes

  • Standard cleaning and inspection
  • Performance report
  • Priority service response
  • Discounted spares if needed

Subsidy & payment process

Apply on portal

We file your PM Surya Ghar application with your electricity consumer number and Aadhaar details.

Feasibility approval

MSEDCL approves the sanctioned capacity for your connection.

Install & net-meter

Installation, inspection and bidirectional meter commissioning.

Subsidy in bank

Subsidy is credited to your linked bank account, usually within 30–45 days of commissioning.

Solar Panel Cleaning Robot / Manual AMC FAQs

How much subsidy do I get on rooftop solar in Maharashtra?
Under PM Surya Ghar: Muft Bijli Yojana, residential consumers get ₹30,000 per kW up to 2 kW and ₹78,000 in total for 3 kW and above. The amount is credited directly to your bank account after installation and net-metering are completed.
How many units does a 3 kW solar system generate per month?
In Maharashtra a well-designed 3 kW rooftop system generates roughly 340–380 units per month across the year, higher in March–April and lower during the monsoon. That typically offsets most or all of a 2–3 BHK household’s consumption.
How long does installation take after I confirm?
Structural work and installation usually take 7–14 days for residential systems once material reaches your site. Net-metering approval and meter installation by MSEDCL typically add 3–6 weeks depending on the circle office workload.
Do you help with the PM Surya Ghar subsidy application?
Yes. We register your application on the national portal with your consumer number, follow up the feasibility approval with your DISCOM, submit the commissioning certificate and track the subsidy until it is credited to your bank account.
What is the difference between on-grid and hybrid solar?
An on-grid system exports surplus power and shuts down during a grid outage for safety. A hybrid system adds a battery bank so you keep running essential loads during outages while still enjoying net-metering credit for exported units.
Talk to a solar engineer

Ready for Solar Panel Cleaning Robot / Manual AMC?

Share your electricity bill and roof details. We will send a kW-by-kW proposal with subsidy, net cost, EMI and 25-year savings. No obligation, no hidden charges.

Call Now Free Site Survey