7.5 HP Community Solar Pump
For FPOs, community irrigation and lift irrigation schemes serving multiple farmers from one source.
7.5 HP Community Solar Pump
For FPOs, community irrigation and lift irrigation schemes serving multiple farmers from one source.
Every package is engineered for your roof or borewell, installed by our own electricians and backed by documented commissioning. Prices shown are indicative turnkey figures for Maharashtra excluding DISCOM charges such as net-meter fees which are billed at actuals.
Why buyers choose this package
- Complete bill of material shared before payment
- Subsidy and net-metering handled end to end
- Written generation estimate for your location
- Five-year O&M included, AMC at ₹5,999/year after that
Package highlights
7.5 HP AC submersible with VFD solar drive
7.5 kW solar array
Larger pumping mains and header design
Flow control valves and distribution integration
Remote monitoring option
Support for FPO and group subsidy applications
Technical specifications
| Pump | 7.5 HP AC submersible |
|---|---|
| Array | 7.5 kW (15 × 500 Wp) |
| Daily output | 1,60,000–2,20,000 litres |
| Head | up to 100 m |
| Best for | FPO, group irrigation |
| Warranty | 5 years pump, 25 years modules |
| Warranty | 5 years on pump and drive, 25 years module performance |
What the price includes
- Cluster requirement study
- Complete pump and array installation
- Distribution plumbing design
- Documentation and subsidy support
Subsidy & payment process
Apply on portal
We file your PM Surya Ghar application with your electricity consumer number and Aadhaar details.
Feasibility approval
MSEDCL approves the sanctioned capacity for your connection.
Install & net-meter
Installation, inspection and bidirectional meter commissioning.
Subsidy in bank
Subsidy is credited to your linked bank account, usually within 30–45 days of commissioning.
7.5 HP Community Solar Pump FAQs
How much subsidy do I get on rooftop solar in Maharashtra?
How many units does a 3 kW solar system generate per month?
How long does installation take after I confirm?
Do you help with the PM Surya Ghar subsidy application?
What is the difference between on-grid and hybrid solar?
Ready for 7.5 HP Community Solar Pump?
Share your electricity bill and roof details. We will send a kW-by-kW proposal with subsidy, net cost, EMI and 25-year savings. No obligation, no hidden charges.